PORTO VERDE

Equipment & Labeling

The gear behind the COA.

Procurement teams want to see the machines. Here's the line — compliance labeling, variable-data coding, and the production and co-pack equipment that runs your spec at volume.

CTM Labeling Systems

CTM Front / Back / Wrap Labeling System

A non-compliant label is a recall waiting to happen. We apply retail-ready labels in-line so every unit carries the correct universal symbol, license info, potency, batch/lot, and warnings before it ships — configurable for front-and-back or full wrap on a single line.

Why brands care — Front/back/wrap flexibility covers jars, tubes, and pouches without re-tooling — and the scan-and-eject option catches a mislabeled unit on the line, not at the dispensary.

Conveyor speed
90–120 ft/min
Conveyor range
2.3″–18″ wide · 4′–12′ long
QC
Label-on-product scan + auto eject
Build
Optional stainless frame, encoder speed-following, stack lights
Power
Single-phase 108–132 VAC (208/220/440V opt.)
FlexPackPRO

FlexPackPRO Thermal-Transfer Coding

Variable data — date codes, expiration, batch/lot, and barcodes — printed in-line at 300 dpi via thermal transfer overprinting. DCC requires batch, manufacture, and expiration data on the label; TTO applies it legibly at speed without pre-printed inventory waste.

Why brands care — No pre-printed label waste, no illegible hand-stamps — compliant variable data on demand.

Print
300 dpi thermal transfer (TTO)
Data
Date / exp / batch-lot / barcode / branding
Integration
Inline coding onto the packaging line
FuturolaSCPRocket BoxCTM Labeling SystemsFlexPackPROFuturolaSCPRocket BoxCTM Labeling SystemsFlexPackPRO

On our floor

The actual gear.

ETS extraction & filtration skid — Porto Verde, Long Beach
ETS extraction & filtration skid
C1D1 collection & recovery — Porto Verde, Long Beach
C1D1 collection & recovery
Pre-roll co-pack staging — Porto Verde, Long Beach
Pre-roll co-pack staging
Labeling & packaging room — Porto Verde, Long Beach
Labeling & packaging room

Production & co-pack

Lines on the floor.

Pre-roll co-pack

STM Rocket Box 2.0 / Pro

Up to ~5,000 cones/hr · ~20,000/daytbc

Pre-roll filling

Futurola Knockbox

~1,000 cones/hr (two-operator)tbc

Vape cart filling

Automated cart fillers

~625–1,800+ carts/hr · ±0.01gtbc

Gummy production

Confectionery depositor

~5,000–18,000 gummies/hrtbc

Live resin / diamonds

Closed-loop hydrocarbon extraction

Fresh-frozen, cold-cure

Distillate

Wiped-film distillation

85–95% total cannabinoidstbc

Throughput figures marked TBC reflect published equipment ranges; exact models and Porto Verde's realized rates are confirmed during scoping.

Spec it out

Want the machine list for your SKU?

Tell us the format and volume — we'll map it to the right line and give you throughput, lead time, and MOQ.